Huge over-pumping project. Maris pumps were dispatched with short notice.
Our Solution
Appointed to over pump the existing city centre sewage while new drains are being laid and connected, the installation consists of 3 x 8” diesel sets running 24hours with a 4TH unit as a standby, the triple 8” pipe runs from the old sewage manholes to the 600x600 manhole in the main road opposite Asda, the 24hr service that Maris pump offer, as yet, has not been necessary on the site regardless, we are always waiting on standby, should anything occur.