Major Over-Pumping Project in Stafford

Maris called in at short notice to provide a major over-pumping solution in Stafford.  Maris quickly setup six mobile diesel driven end suction pumps which comprised of 4 eight in pumps and 2 four inch pumps. Stafford city centre is undergoing major transformation with construction of new precinct shopping centre, a new multi storey car park which incorporates a flood defence system to protect the city centre, cinema and a flagship store for John Lewis.

Maris pumps have been appointed to over pump the existing city centre sewage while new drains are being laid and connected, the installation consists of 3 x 8” diesel sets running 24 hours with a 4TH unit as a standby, you can see in the pictures the triple 8” pipe runs from the old sewage manholes to the 600×600 manhole in the main road opposite Asda. the 24hr service that Maris pump offer, as of yet, has not been necessary on the site, regardless, we are always waiting on standby, should anything occur.

2014-10-13 13.56.372014-10-13 13.55.07

2014-10-13 14.08.482014-10-13 14.01.41

2014-10-13 12.26.28

2014-10-13 13.55.59

2014-10-13 13.54.54

2014-10-13 14.30.30